JPMorgan ChaseMiami Tenant Fit-Out
An eight-floor tenant fit-out across two phases in Miami, including mechanical installations and 484 plumbing fixtures.
Spanning more than two years in Miami, Florida, the project included the installation of 141 variable air volume (VAV) units, 102 fan-powered boxes (FPBs), 16 condenser-water-cooled water-source heat pumps (WSHPs), and nine computer room air conditioning (CRAC) units.
The plumbing scope encompassed multiple restrooms, pantry areas, kitchens, and cafés, totaling 484 plumbing fixtures across the eight-floor build-out.