PROJECT SHOWCASE

Florida

Mechanical, plumbing, and design-build projects delivered across Miami, West Palm Beach, and Sarasota — from multi-floor corporate interiors to large-scale distribution facilities.

01

Corporate &
Tenant Build-Outs

JPMorgan Chase tenant fit-out — Miami, Florida
JPMorgan Chase — Add Image URL
MIAMI, FL

JPMorgan ChaseMiami Tenant Fit-Out

An eight-floor tenant fit-out across two phases in Miami, including mechanical installations and 484 plumbing fixtures.

Spanning more than two years in Miami, Florida, the project included the installation of 141 variable air volume (VAV) units, 102 fan-powered boxes (FPBs), 16 condenser-water-cooled water-source heat pumps (WSHPs), and nine computer room air conditioning (CRAC) units.

The plumbing scope encompassed multiple restrooms, pantry areas, kitchens, and cafés, totaling 484 plumbing fixtures across the eight-floor build-out.

08Floors
141VAV Units
102Fan-Powered Boxes
484Plumbing Fixtures
GTCR tenant fit-out — West Palm Beach, Florida
GTCR — Add Image URL
WEST PALM BEACH, FL

GTCRWest Palm Beach Tenant Fit-Out

High ceilings demanded creative pipe routing and close field coordination throughout this two-floor corporate tenant build-out.

Delivered over more than one year in West Palm Beach, Florida, the project included 36 chilled-water fan coil units (CHW FCUs), four VAV units, and one CRAC unit.

Plumbing installations served multiple restrooms, a shower, kitchen, and pantry area, totaling 92 fixtures. The high ceilings required creative pipe routing and coordination in the field.

02Floors
36CHW Fan Coil Units
92Plumbing Fixtures
01CRAC Unit
Millennium tenant fit-out — Miami, Florida
Millennium — Add Image URL
MIAMI, FL

MillenniumMiami Tenant Fit-Out

A three-floor tenant fit-out encompassing approximately 66,000 square feet, including VAV box replacements and a new rooftop dry cooler.

The project included replacement of approximately 90 VAV boxes throughout the three-floor space. Work also involved installing a new dry cooler on the roof and an express riser to serve tenant equipment.

03Floors
~66KSquare Feet
~90VAV Boxes Replaced
NEWRooftop Dry Cooler
02

Industrial &
Distribution

Ferguson shipping hub office and distribution center — Sarasota, Florida
Ferguson — Add Image URL
SARASOTA, FL

FergusonShipping Hub Office & Distribution Center

A one-year design-build project delivering mechanical and plumbing systems for a 159,597-square-foot office and distribution facility in Sarasota.

The mechanical scope included six VAV units, four fan-powered boxes, two make-up air units (MAUs), four high-volume low-speed (HVLS) fans, three rooftop units (RTUs), eight exhaust fans (EFs), one air curtain, and two electric unit heaters (EUHs).

Plumbing installations supported three restrooms, an administrative office, and a kitchen area, with multiple plumbing fixtures serving these spaces.

159,597Square Feet
01Year Design-Build
03Rooftop Units
04HVLS Fans